News
Electric Arc Furnace
2018-5-3 11:14:37

The steel constructure building for Ethiopia steel factory had been completed successfully.

The building supplied by Shanghai Metallurgy Equipment Group, which belongs to the turnkey project of rebar& wire rod 150,0000 ton per year. The products size of the production is ¢8mm--¢32mm, the billet 120X120-150x150mm.    

                                       06845139-8e49-4ff5-9a02-c09674c567ef-original.jpeg